los-angeles.com

Soft-Story Retrofit in Los Angeles: Which Program Covers Your Address

By los-angeles.com EditorialEdited by Last updated

A soft-story building has too little solid wall on its ground floor to hold the floors above it sideways, usually because the ground floor is parking. 8 cities in Los Angeles County require those buildings to be strengthened, the City of Los Angeles among them, and each ordinance has its own cutoff year and its own deadlines.

The check below names the program for the city an address is in. It cannot tell you whether one particular building is on a list, because the City of Los Angeles does not publish its inventory, and the moving to Los Angeles guide is where the rest of a move lives.

Which retrofit program covers this address?

Put in an address and this names the soft-story program that applies to the city it sits in. It does not read any city's list of buildings, and no answer on it is a statement about the building at the address.

What a soft-story building is

A soft story is a ground floor with so little solid wall that it cannot hold the building above it sideways. The usual cause is parking: a row of garage openings or a tuck-under carport where a wall would otherwise be. The Department of Building and Safety describes these buildings in terms of what they did rather than how they are built, which is that in past earthquakes multi-story buildings with weak or open front wall lines performed poorly and collapsed.

  • Tuck-under parking is the classic case: cars parked underneath the apartments, with columns where a wall would be.
  • A row of garage doors along the ground floor does the same thing, because a door opening carries no sideways load.
  • A ground-floor shop front can too. Glass is not a shear wall, so a 1950s building with retail below and flats above is often on the same list as one with parking.
  • It is about the ground floor only. The stories above are usually ordinary wood framing, which is why the retrofit work is nearly all at street level and why it mostly affects the parking rather than anybody's apartment.

None of that is a judgement about a particular building. Two buildings on one block with the same shape can be built differently inside, which is why every city that runs one of these programs requires a licensed civil or structural engineer to look before anything is decided.

Official sources for this section

Which buildings the City of Los Angeles ordinance covers

Ordinance 183893 and Ordinance 184081 reach a building that meets three tests at once, and the Department of Building and Safety states them in this order: two or more stories of wood frame construction; built under building code standards enacted before January 1, 1978; and ground floor parking or other similar open floor space.

The program does not apply to residential buildings with three or fewer units. So a duplex or a triplex with carports underneath is outside this program whatever it looks like.

12,347
Soft-story buildings in the City of LA

The inventory LADBS reported as of February 1, 2024. The list itself is not published.

24%
Still without a certificate of compliance

2,970 of them, past the seven-year date, as of February 1, 2024.

8
Cities in LA County with a mandatory ordinance

Out of 88. 7 were read off the city's own site; one rests on the state grant program naming it.

$38 per month
Most a rent-stabilized tenant pays a month

The City's own cap on the retrofit surcharge, for up to 120 months. City of Los Angeles only.

The program is further along than most people assume. As of February 1, 2024, 9,377 of the 12,347 buildings had obtained a certificate of compliance and 2,970 had not, which is 24% of the inventory past the seven-year date. That is the newest report the department publishes.

One thing the scope does not include, and it is a common misreading: rent stabilization. The Housing Department describes the ordinance in terms of rent-stabilized buildings on the page about recovering the cost, which is true of the cost recovery. The department that administers the ordinance has a wave of orders for condominiums and commercial buildings.

The deadlines run from the order, not from a date on a calendar

There is no citywide soft-story deadline, and that is the single most misreported thing about this program. The clock starts on the day an owner received their own Order to Comply, and the orders went out in seven waves over eighteen months.

Which wave a building was in depended on its size, so two buildings on the same street can be eighteen months apart. The table below is when each wave started going out, which is not the same as the day any one owner was served.

City of Los Angeles soft-story deadlines, counted from the day the Order to Comply was received
From the orderWhat is due
2 yearsSubmit proof of previous retrofit, or plans to retrofit or demolish
3.5 yearsObtain permit to start construction or demolition
7 yearsComplete construction
Counted from the receipt of the Order to Comply, not from the ordinance. The orders went out in seven waves between May 2016 and November 2017, so two buildings on one street can be eighteen months apart. Read off LADBS, Soft-Story Retrofit Program, How to Proceed on 2026-11-01.

When each wave of orders went out

The priority order was by size, biggest first, on the reasoning that the buildings with the most people in them should be strengthened soonest. Condominiums and commercial buildings came last.

When the City of Los Angeles started sending each wave of orders
PriorityBuildingsOrders from
I16 or more dwelling units, 3 stories and aboveMay 2, 2016
I16 or more dwelling units, 2 storiesJuly 22, 2016
II3 or more stories with fewer than 16 unitsOctober 17, 2016
III9 to 15 unitsJuly 24, 2017
III7 to 8 unitsAugust 21, 2017
III4 to 6 unitsSeptember 25, 2017
IIICondominiums and commercialNovember 6, 2017
These are the dates each wave started going out rather than the date any one owner was served, which is what the deadlines are counted from. Read off LADBS, Soft-Story Retrofit Program, priority table on 2026-11-01.

Concrete buildings are a separate program with a separate clock

Somebody standing in front of a 1960s concrete apartment block searching for "soft story" is reading about the wrong program. The City of Los Angeles runs a second mandatory retrofit program for non-ductile concrete buildings, and almost nothing about it is the same.

It reaches concrete buildings with a roof or a floor supported by a concrete wall or a concrete column. The cutoff is a plan check date rather than a build date: submitted for plan check before January 13, 1977.

Any concrete building within the ordinance built under a new-building permit application submitted before January 13, 1977 is subject to the ordinance whether LADBS has identified it or not.

LADBS is still identifying the buildings, so there is no list to check. Its own page points an owner at the Permit and Inspection Report, which is the permit history for one property.

City of Los Angeles non-ductile concrete deadlines, from the Order to Comply
From the orderWhat is due
3 yearsSubmit a completed checklist so LADBS can determine whether the building is non-ductile concrete
10 yearsSubmit proof of previous retrofit, or plans to retrofit or demolish
25 yearsComplete construction
A different program with a different cutoff: submitted for plan check before January 13, 1977. Read off LADBS, Non-ductile Concrete Retrofit Program on 2026-11-01.

Official sources for this section

If you rent in one

Two things reach a tenant, and both are the City of Los Angeles's own rules rather than California's. The first is money. The City Council limited what a landlord may pass on, and the limit is $38 per month a month for up to 120 months.

  • The share is capped at half. Up to 50% of the total seismic retrofit cost, divided equally among all rental units, if LAHD approves it.
  • The monthly amount is capped too. $38 per month a month, for 120 months. The recovery period may be extended until the full approved amount has been collected.
  • It is not automatic. The landlord has to apply within 12 months of completing the retrofit work. The Housing Department has to approve it, and a Tenant Habitability Plan has to be on file first.

The second is the work itself, and the protection has a name. A Tenant Habitability Plan is a document the owner prepares with LAHD's own Tenant Habitability Program staff. It sets out the work and the methods the owner, the contractor and the workers will use to reduce the impact on tenants and their belongings while it goes on. It is required on a building subject to the Rent Stabilization Ordinance where the work exposes the building frame, which seismic retrofitting does. LADBS requires the plan to be filed after the permits are pulled, and LAHD will not process a cost-recovery application without one.

The plan has to name the mitigation measures, and LAHD says they may include work procedures that let a tenant stay on site, temporary relocation, or both. The standard it has to meet is specific: A tenant may not be required to occupy an untenantable dwelling, as California Civil Code section 1941.1 defines one, outside the hours of 8am to 5pm Monday to Friday, and may not be exposed at any time to toxic or hazardous materials including lead-based paint and asbestos.

How much notice a tenant gets, and what a tenant relocated for the work is owed, are not on the pages this was read off. They are in the ordinance, and nothing here guesses at either. The unit that handles seismic work is on (213) 252-1464.

How to get the official list

The City of Los Angeles does not publish its soft-story inventory as something an address can be checked against. There is no map and no downloadable list.

The inventory comes from the LADBS Custodian of Records. That office answers public records requests, and its own page says anyone can make one and that records are open for inspection during regular office hours. It publishes no online form, so a request is a telephone call or an email.

  • There is no online form, so the request goes by telephone on (213) 482-6770 or by email to LADBS.custodianofrecords@lacity.org. Those are the details the department publishes on the soft-story page itself.
  • Ask for the soft-story inventory by name, because the office answers requests for every kind of building record the department holds and saying which list you want saves a round trip.
  • Anyone may ask. The office's own page says anyone can initiate a public records request and that records are open for inspection during the agency's regular office hours, so you do not have to own the building or live in it.
  • It is a records request rather than a question, which means it goes in writing and comes back as records. If what you want is one building rather than the whole list, the owner is faster, because every identified building was served an order.

One thing to know before you click: the soft-story page carries a link labeled "Verify if My Building Applied". The soft-story page carries a link labeled "Verify if My Building Applied". It opens a bar chart of program totals citywide and by council district as of February 1, 2024. It verifies no building and names no address.

For one building rather than the whole list, the owner is the fastest route, because every identified building was served an order. In the City of Los Angeles the clock runs from the day the owner received the order: 2 years to submit proof of a previous retrofit or plans to retrofit or demolish, 3.5 years to pull the permit, and 7 years to finish the work.

The City of Long Beach wrote the useful version of that about its own map: "A SWOF condition in a building exists whether the building is identified on a list or not." A building absent from a list was not cleared by anybody. It was not looked at.

Not finding a building here does not mean it is safe or exempt. This check names the program that applies to an address. It does not read any city's inventory, and no answer on it is a statement about a building.

Official sources for this section

The other cities, and the ones that do publish a list

This page holds a program for 9 of the 88 cities in Los Angeles County: 8 with a mandatory ordinance, plus Long Beach, which surveyed its buildings and requires nothing. 4 of the 9 publish the affected properties, which is the part the largest city does not.

Which of them covers an address is decided by the city line. A mailing address that says Los Angeles is not the same thing as being in the City of Los Angeles. Some addresses that take LA mail are unincorporated county land, and much of the San Fernando Valley is inside the city under postal names of its own: Van Nuys, North Hollywood, Encino, Canoga Park, Reseda, Northridge, Sylmar and Woodland Hills are all City of Los Angeles addresses.

This page holds a program for nine of the 88 cities in Los Angeles County. A city that is not among them may still have one: the eight mandatory ordinances here were found by opening each city's own site, and several cities' sites cannot be read from where this page is built. So an answer that names no program means this page does not hold one, never that the city has none.

Long Beach is the case worth reading even if you do not live there. It surveyed its buildings, notified every owner twice, published a searchable map and required nothing: its own FAQ says the program is voluntary and that there are no immediate consequences for an owner who does not strengthen a building. Whether Los Angeles County requires soft-story retrofits on the land it governs directly is not established on this page. Every Los Angeles County web host, including Public Works and the county code, refuses the connection from where this page is built, so no County page was read.

Mandatory soft-story programs this page holds, by city
CityRequirementOrdinancePublic list
Los AngelesMandatoryOrdinance 183893 and Ordinance 184081Not published
Santa MonicaMandatoryNot stated on the page we readSearchable map
West HollywoodMandatoryOrdinance 17-1004 for soft story, Ordinance 17-1011 for concrete and steelOpen data portal
Beverly HillsMandatoryOrdinance 18-O-2767Not published
PasadenaMandatoryOrdinance No. 7345, Pasadena Municipal Code Chapter 14.08Not published
Culver CityMandatoryOrdinance No. 2021-013Searchable map
TorranceMandatoryOrdinance 3916Not published
BurbankMandatoryNot stated on the page we readNot published
Long BeachVoluntaryLong Beach Municipal Code 18.70, a voluntary ordinance from 2008Searchable map
Nine cities out of 88. This page holds a program for nine of the 88 cities in Los Angeles County. A city that is not among them may still have one: the eight mandatory ordinances here were found by opening each city's own site, and several cities' sites cannot be read from where this page is built. So an answer that names no program means this page does not hold one, never that the city has none. The muted row is the one confirmed by the state grant program rather than by the city.

Earthquake Brace + Bolt does not pay for this

The grant everybody has heard of is the wrong one. An Earthquake Brace + Bolt retrofit is only done on wood-framed, pre-1980 homes with a raised foundation. The work it pays for is bolting a house to its foundation and bracing the short cripple walls above it. A building with ground-floor parking does not have that condition, and the program's own page describes no story or unit limit because the foundation requirement does the work.

There is a right one, run by the same agency. Earthquake Multi-Unit Retrofit strengthens multi-unit residential buildings with a soft, weak or open-front seismic deficiency. It is run by the California Residential Mitigation Program, the same joint powers authority that runs Brace + Bolt.

  • Which buildings. Wood-framed, multi-story buildings built before 1991 with 5 to 10 units, with tuck-under parking or open ground-floor space beneath living areas.
  • It needs an order first. The owner must have received a notice and order to retrofit from the city, and the city must have a mandatory multi-unit soft-story ordinance.
  • The engineering. Up to 70% of pre-retrofit engineering and permit fees, not to exceed $7,000.
  • The work. Up to 70% of the retrofit cost, capped at $4,260 per unit.
  • Do not start before you are approved. Work started before the program approves the project makes it ineligible for the incentive payments.

The retrofit has to be a full ground-floor retrofit under FEMA P-807, IEBC Chapter A4 or ASCE 41. A line-only retrofit does not qualify. Registration windows open and close, so the program's own page is the only place worth reading for whether one is open.

A homeowner with a raised-foundation house is in the right place with Brace + Bolt: Up to $3,000 toward a code-compliant seismic retrofit of a qualifying house. An income-eligible homeowner can apply for a further grant of up to $7,000.

How current this page is

Last updated

Confirmed

  • The City of Los Angeles's own soft-story and non-ductile concrete programs, both read off the Department of Building and Safety's own pages on 2026-11-01: the scope, the three deadlines, the seven waves of orders and the program status report.
  • That the City publishes no soft-story inventory an address can be checked against, and that the route to it is a public records request to the LADBS Custodian of Records.
  • What a landlord in the City of Los Angeles may pass on to a rent-stabilized tenant, and the Tenant Habitability Plan that governs the work, both from the LA Housing Department's own pages.
  • 8 cities in Los Angeles County with a mandatory soft-story ordinance, 4 of which publish the affected properties, each read off that city's own site or open-data portal.
  • That Earthquake Brace + Bolt is for houses with a raised foundation, and that the multi-unit grant is a different program, both from the state program's own pages.

What this page cannot tell you yet

  • Whether Los Angeles County requires soft-story retrofits on the land it governs directly is not established on this page.
  • Burbank's ordinance. The state grant program names Burbank among the cities with a mandatory ordinance and burbankca.gov cannot be read from where this page is built, so the number, the cutoff and the deadlines are all unread.
  • How much notice a tenant gets before the work starts, and what a tenant relocated for it is owed. Neither is on the pages this was read off, and both are in the Tenant Habitability ordinance.
  • What a retrofit costs. Every figure in circulation comes from a company selling the work and the published ranges differ by a factor of three, so none is on this page.
  • Whether the City of Los Angeles figures have moved. Its newest status report is dated February 1, 2024 and nothing more recent is published.

What changed

  • : Written, with the program routed from the city line rather than from a list of buildings.

Common questions

Is there a public list of soft-story buildings in Los Angeles?
Not one the City of Los Angeles publishes. The inventory comes from the LADBS Custodian of Records on (213) 482-6770 or LADBS.custodianofrecords@lacity.org, as a public records request, and anyone may ask for it. Four other cities in the county do publish theirs: Santa Monica and Culver City as searchable maps, West Hollywood on its open data portal, and Long Beach as a map of a voluntary program.
My building is not on any list. Does that mean it is safe?
No. Long Beach put it best about its own map: a soft, weak or open-front condition in a building exists whether the building is identified on a list or not. A building absent from an inventory was not cleared by anybody, and in the City of Los Angeles there is no inventory to be absent from. Only a licensed civil or structural engineer can say anything about a particular building.
What is the deadline for a soft-story retrofit in Los Angeles?
There is no single date. In the City of Los Angeles the clock runs from the day the owner received their own Order to Comply: two years to submit plans, three and a half years to pull the permit, and seven years to finish. The orders went out in seven waves between May 2016 and November 2017, so two buildings on one street can be eighteen months apart. Other cities count from their own notices and use different periods.
Can my landlord charge me for the retrofit?
In the City of Los Angeles, part of it, and the City Council capped both halves. A landlord may apply to pass through up to 50% of the cost divided equally among the units, and the surcharge may not exceed $38 a month for 120 months. The Housing Department has to approve it, the landlord has to apply within 12 months of finishing the work, and a Tenant Habitability Plan has to be on file before any of that.
Does Earthquake Brace + Bolt cover a soft-story retrofit?
No. Brace + Bolt is only done on wood-framed, pre-1980 homes with a raised foundation, which is a different condition from a ground floor of parking. The program for a soft-story building is Earthquake Multi-Unit Retrofit, run by the same state agency, and it is for wood-framed buildings built before 1991 with 5 to 10 units whose owner has already received an order to retrofit from the city.

In this guide

  • Moving to Los AngelesWhich Los Angeles an address is actually in, what a landlord may take up front, and what California asks of a new resident.
  • Dog License in Los AngelesThere is no single LA dog license. 11 agencies issue them across the county and the city line decides which one covers you. Check an address, see the fee, and go straight to the right counter.
  • Renters Insurance and Earthquakes in Los AngelesA renters policy does not cover earthquake damage. A separate CEA policy does, fire following a quake is covered by state law either way, and no landlord has to tell you what hazard zone the building is in.
  • Who Is My Electricity Provider in Los Angeles?There is no single California electricity provider. 9 sell power inside Los Angeles County alone, and the city line decides which one reaches your address. Check it against the state's own service-area map.
  • Moving to Los Angeles ChecklistTwo deadlines and one requirement with no deadline: 10 days to tell the DMV your new address, 20 days to register an out-of-state car, and a California license if you drive. Every item from the DMV's own pages.

Sources: LADBS, Soft-Story Retrofit Program: https://dbs.lacity.gov/services/specialized-services/mandatory-retrofit-programs/soft-story-retrofit-program, LADBS, Non-ductile Concrete Retrofit Program: https://dbs.lacity.gov/services/specialized-services/mandatory-retrofit-programs/non-ductile-concrete-retrofit-program, LADBS, Custodian of Records: https://dbs.lacity.gov/services/special-assistance/custodian-of-records, LADBS, Soft Story Retrofit Program Status as of February 1, 2024: https://dbs.lacity.gov/sites/default/files/styles/medium/public/soft-story-compliance-report.pdf, City of Los Angeles Ordinance 183893: https://dbs.lacity.gov/sites/default/files/styles/medium/public/ordinance_183893.pdf, LAHD, The Seismic Retrofit Work Program: https://housing.lacity.gov/rental-property-owners/the-seismic-retrofit-work-program, LAHD, Tenant Habitability Program: https://housing.lacity.gov/rental-property-owners/tenant-habitability-program, California Residential Mitigation Program, EMR Retrofit: https://www.crmp.org/our-seismic-retrofit-programs/the-retrofits/emr-retrofit, California Residential Mitigation Program, EBB Retrofit: https://www.crmp.org/our-seismic-retrofit-programs/the-retrofits/ebb-retrofit, City of Santa Monica, Seismic Retrofit Program: https://www.santamonica.gov/programs/seismic-retrofit-program, City of West Hollywood, Visual Survey of Properties Subject to the Seismic Retrofit Ordinances: https://data.weho.org/Housing/West-Hollywood-Visual-Survey-of-Properties-Subject/52pw-42ra, City of Beverly Hills, Seismic Retrofit Program: https://www.beverlyhills.org/491/Seismic-Retrofit-Program, City of Pasadena, Soft-Story Retrofit Ordinance: https://www.cityofpasadena.net/planning/soft-story-retrofit-ordinance/, City of Culver City, Seismic Retrofit Program, Soft Story: https://www.culvercity.gov/City-Hall/Reports-policies-local-laws/Seismic-Retrofit-Program, City of Torrance, Seismic Retrofit Program: https://www.torranceca.gov/Government/Departments-Offices/Departments-Offices/Community-Development/Building-and-Safety/Seismic-Retrofit-Program, City of Long Beach, Building Seismic Resiliency Program: https://www.longbeach.gov/lbcd/building/seismicprogram/

This is an editorial guide. It explains and links to official sources, and it is not legal, tax or travel advice.